The universal Maly Port terminal is situated in the ice-free Wrangel Bay, Primorsky Region, offering year-round navigation. It was commissioned in 1992.
The terminal boasts well-developed infrastructure, a modern sorting complex, and advanced cargo handling technology.
It operates three berths, totaling 416.8 meters in length, with a berth wall depth of up to 12 meters.
The terminal can accommodate vessels with up to 80,000 tons deadweight, including Panamax-class ships.
Its rail infrastructure can handle the receipt and unloading of up to 150 railcars per day. The terminal has a total storage area of 29,455 m², with a coal storage capacity of 100,000 tons.
Loading operations are performed using four “Aist” portal cranes, each with a rated capacity of 400 t/h and a maximum lifting capacity of 40 tons.
The terminal operates four telescopic radial conveyors and six transfer machines, each with a maximum capacity of 420 t/h.
Number of employees — 292.
Website:
https://malyport.ru/ Social media account:
https://t.me/skmalyport